WIKA operating instructions air2guide model A2G-30
9
GB
40202763.02 07/2012 GB/D/F/E/I
6. Commissioning, operation
Installation
The inclined tube manometer must be screw-tted on a suitable
vertical surface
The instrument has to be mounted horizontally using the attached
self-tapping screws.
Filling
Turn the zero button back up until the stop. Then turn approximately one
rotation in a clockwise direction, so that the adjustment can be made in
both directions. Unscrew the ll button and ll the measuring instrument
liquid until the liquid is visible near the zero point on the measuring
scale. Make an accurate adjustment with the zero button and then
re-seal the lling hole.
Connection to the air lter
Make the hose connection between the ⊖ connection of the measuring
instrument with the downstream side of the lter and the ⊕ connection
of the measuring instrument with the upstream side of the lter. Stick
the green and red labels next to each other on the scale, in order
to mark the initial (green) and nal pressure (red). Please note the
recommendations of the plant manufacturer regarding the maximum
allowable pressure drop values .
Information
The inclined tube manometer is specially designed
to prevent leakage of the indicator uid in the case of
overpressure.
6. Commissioning, operation